Results 1 to 15 of 889

Thread: Reconstruction has begun.

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    I have a door on the right, like you, but on the drivers side we can pull the handle you see in this pic (sorry too Steve for the hijack... it's only temporary).
    Attached Images Attached Images
    Roger Moore

    63 "Flarechero"
    powered by: 347ci stroker | Tremec T5 | 8" 3:45 TracLoc rear



  2. #2
    Nice feature! I'll have to check it out at the next show and take some measurements.

    And now back to our regularly scheduled reconstruction!

    Kenny Likins
    Ballard, Seattle, WA
    www.redfalken.com

    `62 Tudor Sedan (`69 200, C4, 8-inch 4-lug 2.79 rearend, Duraspark II, MSD, Weber 32/36 DGEV)

  3. #3
    Join Date
    Aug 2009
    Location
    Sequim
    Posts
    2,117
    No worries; Let me know how that vent works out. if it does I will use it in the delivery.
    I think you are right about the twinkle, I did have some tough spots to weld that used the close your eyes tighter and you won't be blind method??

  4. #4
    Join Date
    Aug 2009
    Location
    Sequim
    Posts
    2,117
    Started on the quarter repairs this weekend. Spent HOURS fitting the lower panel. I think it came out well. Cut out the upper part but ran out of steam. I want to wait to weld the hell out of it till I fit the upper piece, that way I can be sure it all lines up the way it should.
    Hopefully by the end of May I can get the metal spraying done!
    Also took a pic of the upper piece I cut out. UGLY stuff!!!
    Attached Images Attached Images

  5. #5
    Join Date
    Aug 2009
    Location
    Sequim
    Posts
    2,117
    OK. I finally have some progress to show. Things got way ugly before they started to look better.
    Pulled the whole quarter panel off to fit the upper piece in the right way that took about a week. Did some rust prevention on the inner panel while it was accessible, and started putting it back together. Still needs a bunch of work but my Buddie is helping me out a bit. That is him in the pic.
    So I got the rest of the floor pans in some of which we had to make, and I hope to start putting the panels back in the side soon. I figure I hadn't put anything up for a while so the bored people can get interested again and those who weren't can see the painfully slow progress of some of this type of work. As usual any input is always welcome. Enjoy Steve.
    Attached Images Attached Images

  6. #6
    Join Date
    Aug 2009
    Location
    Sequim
    Posts
    2,117
    Well I am just about done with the rust repair. Couple more small things and I will be ready for the metal spray on the floors and so forth.
    Here are some updated pics, and when I spray the metal down I will get some pics of that as well.
    Attached Images Attached Images

  7. #7
    Join Date
    Aug 2009
    Location
    Sequim
    Posts
    2,117

    Metal Spraying

    OK here are some pics of the metal spraying. Hope they show OK. Some are before and some are afters. I will try to put them in the right order.
    Attached Images Attached Images

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •